PDCA / Plan-Do-Check-Act

In French: PDCA (roue de Deming)

PDCA is the four-step improvement cycle — plan, do, check, act — whose value lies in its last two steps, almost always skipped.

What it is

Plan — state what you want to obtain, how you will go about it, and above all how you will know it worked. A plan without a success criterion makes the check step impossible.

Do — implement, on a small scale. A trial on one station tells you more than a roll-out across the whole line, and costs infinitely less when it fails.

Check — compare what is observed with what was planned. It is the step that gets skipped, because it is the only one that can say you were wrong.

Act — only two outcomes, and one must be chosen: either the result is achieved and you standardise, or it is not and you go back to planning with what you have learnt. "We’ll see later" is not a third option, it is abandonment.

PDCA or PDSA

The wheel is commonly attributed to W. Edwards Deming, who had it from Walter Shewhart. Deming in fact argued for PDSA — study instead of check — because "check" suggests inspection, whereas the step consists of studying what happened, including what had not been anticipated.

The nuance is not academic: it changes what is done at that step. Checking is ticking a box. Studying is looking for why the gap exists, and sometimes discovering that the initial hypothesis was wrong for an interesting reason.

The full picture also has a wedge under the wheel: that is the standard. Without it, the wheel rolls back down the slope it has just climbed — the next cycle starts again from a level that was thought secured.

The common mistake

Looping on Plan-Do, indefinitely. Actions follow one another, each looks sensible, and nobody can say which one produced an effect — nor whether any of them did. An organisation that never practises the Check does not improve: it changes, which is not the same thing and costs more.

On the shop floor — Pharmaceutical industry

An action plan had forty-two lines closed as "done" over the year. None carried a before/after measurement. The following year, only four actions were retained, each with a success criterion: two were kept, two dropped — and for the first time it was known which.

The other tools illustrated by this trade: healthcare and life sciences.

An article that covers it

Frequently asked questions

What does PDCA mean?

The four letters stand for Plan, Do, Check, Act: prepare by stating what is expected, experiment on a small scale, compare what was obtained with what was expected, then conclude by generalising or starting again. The cycle is usually drawn as a wheel, because it is meant to start over rather than end.

What is the difference between PDCA and PDSA?

Only the third letter changes, and it changes the gesture. Checking is confirming that what was planned was indeed done. Studying is examining what happened, including the effects that were not expected and that are often the most instructive. Deming defended the second wording for that precise reason.

What is the difference between PDCA and DMAIC?

The first is a general learning cycle, applicable to any improvement, including one of a few hours. The second is a project approach structured in five phases, with deliverables and gate reviews, designed for a problem whose cause is unknown and whose resolution requires data. One is a reflex, the other a framework.